- +92 21 ---------
- Elevatia Learning Hub, Port Qasim, Karachi
- info@elevatialearninghub.com
Programme Calendar
Mechanical Maintenance & Engineering | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Introduction To Maintenance Engineering
|
||||||||||||
Reverse Engineering - 3D Computer Aided Drawing (CAD) Software
|
||||||||||||
Reverse Engineering - 3D Dimensional Analysis Software
|
||||||||||||
Refractory Application & Quality Control
|
13-13 |
01-01 |
||||||||||
Valves Maintenance, Overhauling & Troubleshooting
|
27-27 |
|||||||||||
Steam Turbines - Introduction, Maintenance & Overhauling
|
||||||||||||
Understanding of Metallurgy (Ferrous, Non-Ferrous & Alloy)
|
18-18 |
|||||||||||
MIG Welding Basics, Techniques and Controls
|
||||||||||||
Boiler Feedwater Pumps Maintenance, Overhauling & Troubleshooting
|
20-20 |
14-14 |
||||||||||
Air Compressors Maintenance & Troubleshooting
|
27-27 |
21-21 |
||||||||||
Basics of Pipe & Pipe Fitting Standards
|
02-02 |
03-03 |
||||||||||
Heat Exchangers Inspection & Maintenance
|
21-21 |
15-15 |
||||||||||
Understanding of Pressure Vessel Design
|
05-05 |
|||||||||||
Introduction to Pressure Vessel Design Software
|
06-07 |
Electrical & Power Engineering | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Introduction to Electrical & Power Engineering
|
||||||||||||
Electrical System Fundamentals - Transformers & its application
|
14-14 |
22-22 |
||||||||||
Electrical Grid Operation Basics, Protection Schemes
|
17-17 |
25-25 |
Instrument & Control Engineering | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Process Intstrumentation - Control Valves
|
||||||||||||
Process Instrumentation - Field Instrument
|
18-18 |
|||||||||||
CO2 & Inergen Based Fire Protection System Control & Troubleshooting
|
06-06 |
19-19 |
||||||||||
Control Valve & PSV - Operation, Calibration & Testing
|
19-19 |
|||||||||||
Control System Basic Engineering and Operations
|
30-30 |
16-16 |
||||||||||
STG Control System - PLC Proficy / Cimplicity
|
||||||||||||
Machine Monitoring System - Bently Nevada 3500 & 3701
|
03-04 |
20-21 |
||||||||||
BMS Control System
|
||||||||||||
Safety Instrumentation System (SIS)
|
23-24 |
05-06 |
||||||||||
Process Automation System - Backend
|
01-02 |
01-02 |
17-18 |
Inspection Engineering | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Fundamentals of Thermography Inspection
|
||||||||||||
Welding Technology - Fundamentals, Defects & Remedies
|
12-12 |
|||||||||||
Machine Data Acquisition & Diagnosis Software
|
28-29 |
21-22 |
||||||||||
Ultrasonic Testing (UT) Methodology & Application
|
24-24 |
26-26 |
||||||||||
Machinery Diagnostics - Module 02
|
07-08 |
Health, Safety & Environment | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Work Permit Procedure
|
20-20 |
16-16 |
||||||||||
HPCO2 & Inergen System
|
||||||||||||
Hazard Identification, Risk Assessment & JSA
|
05-05 |
24-24 |
||||||||||
Electrical Safety as per NFPA
|
11-11 |
27-27 |
||||||||||
Emergency Response Procedure
|
19-19 |
|||||||||||
Incident Reporting & Investigation
|
22-22 |
26-26 |
||||||||||
Transport Safety & Safe Driving
|
14-14 |
11-11 |
Operations & Process Control | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug |
---|---|---|---|---|---|---|---|---|---|---|---|---|
CASH Area Process, Operation and Control
|
||||||||||||
BOP Process, Operation and Control
|
18-19 |
29-30 |
||||||||||
Process Simulation using Aspen HYSYS
|
||||||||||||
Process Simulation using Aspen EDR
|
||||||||||||
Boiler Process, Operation and Control
|
21-21 |
24-24 |
||||||||||
Back Pressure Type Steam Turbine Process, Operation and Control (10MW)
|
||||||||||||
Condensing Type Steam Turbine Process, Operation and Control (60MW)
|
15-15 |
|||||||||||
Dust Control System Operations
|
04-04 |
15-15 |
||||||||||
Process Hazard & Risk Analysis (PH & RA)
|
14-15 |
|||||||||||
Condensing Type Steam Turbine Process, Operation and Control (24MW)
|
03-03 |
15-15 |
Management & Analytics | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug |
---|---|---|---|---|---|---|---|---|---|---|---|---|
SAP Material Management (MM) Module
|
09-10 |
18-19 |
||||||||||
SAP Plant Maintenance (PM) Module
|
11-12 |
01-02 |
01-02 |
|||||||||
CAD Basics - Computer Aided Drawing Software
|
25-27 |
07-09 |
||||||||||
SAP Document Management System (DMS) Module
|
||||||||||||
MS Project - Project Management Software / Schedule Management
|
22-23 |
22-23 |
||||||||||
Data Analysis Engineering & Techniques
|
||||||||||||
Maintenance & Reliability Best Practices
|
11-13 |
09-11 |
||||||||||
SAP Production Planning (PP) Module
|
30-30 |
|||||||||||
Root Cause Analysis Techniques
|
02-03 |
28-29 |
||||||||||
Operational Excellence in Process Industry
|
28-29 |
|||||||||||
SAP Customer Service Module
|
08-08 |
22-22 |